The point is added at the next available point in the curve. The data-point counter is incremented after the point is added.
Assignment of the significance of each data column is up to the programmer.
Data0 | REAL | The datum to be placed in column 0 | |
Data1 | REAL | The datum to be placed in column 1 | |
Data2 | REAL | The datum to be placed in column 2 | |
Data3 | REAL | The datum to be placed in column 3 |